Highways Dept. calls for consultants to prepare DPR on linking OMR, ECR
The Highways Department has asked consultants to produce a Detailed Project Report (DPR) that connects the Outer Ring Road (OMR) with the Eastern Corridor Road (ECR). It must be completed within a three‑month timeframe, according to a notice from the ministry. The report will outline design specifications, cost estimates, and environmental considerations for the link.